When a commercial lease ends and the premises have not been kept in the condition the lease requires, the landlord may bring a dilapidations claim. Landlords often start by pricing the work needed to put things right. However, the amount a landlord can actually recover for breach of a repairing covenant is not simply the cost of the repairs. Section 18 of the Landlord and Tenant Act 1927 places a cap on damages, and it is one of the most important rules for both landlords and tenants to understand.
This guide to section 18 dilapidations rules explains what section 18 says, how the diminution in value cap works in practice, what a diminution valuation is, and how it fits with the Dilapidations Protocol. It is general guidance, not legal advice, and the outcome of any claim will depend on the lease and the facts.
What does section 18 say?
Section 18(1) of the Landlord and Tenant Act 1927 has two parts, often called the two “limbs”.
The first limb: the diminution in value cap
Damages for a breach of a covenant to keep or put premises in repair, or to leave or put them in repair at the end of the lease, cannot exceed the amount by which the value of the landlord’s interest in the premises (the reversion) is reduced by the breach. In other words, the landlord’s claim is capped at the loss in value of the property caused by the disrepair, even if the cost of the works is higher.
The second limb: no damages if the premises will be demolished or altered
No damages are recoverable for failing to leave or put the premises in repair at the end of the lease if the premises, in whatever state of repair they might be, would at or shortly after termination be pulled down, or would be structurally altered in a way that would make the repairs valueless.
Which claims does section 18 cover?
Section 18(1) applies to breaches of repairing covenants. It does not apply in the same way to every item that may appear in a schedule of dilapidations London. Claims for failing to reinstate alterations or remove fixtures and fittings, for example, are not caught by the statutory cap and are assessed under the ordinary common law rules on damages, which also aim to compensate the landlord for its actual loss rather than simply award the cost of works. Decorating covenants, statutory compliance items and service charge obligations may also need separate consideration depending on the wording of the lease.
This is why a well-prepared schedule usually separates out repair, reinstatement and redecoration items, and why the lease wording is always the starting point.
How does the diminution in value cap work in practice?
The cap compares two values of the landlord’s interest at the end of the lease:
- The value of the property in the condition it should have been in had the tenant complied with its repairing obligations
- The value of the property in its actual condition at the end of the lease
The difference between the two is the diminution in value, and the landlord’s damages for disrepair cannot exceed that figure.
In many cases, the cost of repairs is a reasonable guide to the loss in value, especially where the landlord actually carries out the works and relets the property. But there are situations where the diminution may be much lower than the cost of works, for example where:
- The landlord intends to redevelop or substantially refurbish the building, so the tenant’s repairs would be superseded
- The market for that type of property means a buyer or incoming tenant would pay much the same whatever its condition
- The landlord has sold or relet the premises on terms that are not affected by the disrepair
- The incoming tenant is taking on the property for a scheme that strips out much of the existing fit-out
In those cases, a tenant may argue that the landlord’s real loss is limited, and a valuation is usually needed to test that argument.
Looking for experienced, professional commercial property surveyors?
Fill in your details and we'll give you a call.
GET IN TOUCHWhat type of survey or report do you require?
Please enter the location details of the property you'd like surveyed.
For Employer's Agent please enter the project location.
Please enter the size of the property you would like surveyed.
Please enter the size of the property you would like surveyed.
Please enter the size of the property you would like surveyed.
Please enter the size of the property you would like surveyed.
Please enter the size of the property you would like surveyed.
Please enter the value of the project you require an Employer's Agent for.
Please enter the size of the property you would like surveyed.
Please enter the size of the property you would like surveyed.
Fill in your details below to get your instant quote.
Fill in your details below to get your instant quote.
By clicking below you are agreeing to our Privacy Policy.
Summary
| Description | Information | Quantity | Price |
|---|---|---|---|
| Discount : | |||
| Total : | |||
What is a diminution valuation?
A diminution valuation is a formal valuation carried out to assess the reduction in the value of the landlord’s interest caused by the breaches. The Dilapidations Protocol says that if a formal diminution valuation is produced, it should be prepared by a valuer. Where the landlord has not carried out all the works in the schedule and does not intend to carry out some or all of them, the Protocol says it should usually provide a formal diminution valuation.
The valuer will normally consider the market for the property, the likely purchaser or tenant, the landlord’s plans, and how the market would treat the disrepair. A commercial building valuation specialist with dilapidations experience can prepare this evidence, and it often works alongside a building surveyor’s assessment of the condition and the cost of the works.
How section 18 fits with the Dilapidations Protocol
The Pre-Action Protocol for Claims for Damages in Relation to the Physical State of Commercial Property at Termination of a Tenancy, usually called the Dilapidations Protocol, sets out the steps the parties are expected to follow before court proceedings. Section 18 runs through it:
- The landlord’s quantified demand. The Protocol expects the landlord to quantify its loss with a detailed breakdown based on a formal diminution valuation, an account of the actual expenditure, or a combination of both where only some works have been done.
- The landlord’s intentions. Where the landlord has not yet done all the works but intends to, it must identify which works it will carry out, when, and what steps it has taken towards them. This can affect the value of the claim, and the landlord’s wider plans can also be relevant to the second limb of section 18.
- The tenant’s response. The tenant should usually respond within 56 days of receiving the quantified demand. If the tenant relies on a diminution in value defence, it must state its case and provide its own diminution valuation, generally within 56 days after the landlord sends its detailed breakdown.
Raising section 18 early, with proper evidence, gives both sides a clearer view of the realistic value of the claim and can help avoid unnecessary costs.
Practical points for landlords
- Be clear and honest about your intentions for the property, and keep records of decisions about reletting, sale or redevelopment.
- Consider whether a diminution valuation is needed before issuing a quantified demand, especially where works will not be carried out.
- Separate repair items from reinstatement and other items, as different rules may apply.
Practical points for tenants
- Ask what the landlord intends to do with the premises, and look for evidence such as planning applications, marketing or redevelopment plans.
- Do not assume the cost of works is the measure of loss. Consider whether a valuation would show a lower figure.
- Get advice early. A dilapidations survey before the lease ends can help you plan, budget and negotiate.
Section 18 FAQs
Does section 18 mean the landlord gets nothing?
Not usually. It caps damages for disrepair at the loss in value of the reversion. In many claims, the cap is close to the cost of works. It matters most where the landlord’s plans or the market mean the disrepair has little effect on value.
Can a landlord claim if it never carries out the repairs?
It can still bring a claim, but whether the works are done is relevant to its actual loss, and the Protocol expects the landlord to explain which works, if any, it intends to carry out. Where the repairs are not carried out, a diminution valuation becomes more important.
Who should prepare the evidence?
Usually a building surveyor prepares or responds to the schedule and costings, while a valuer deals with the diminution in value. Solicitors are often involved on lease interpretation and legal strategy.
Get help with section 18 and dilapidations
Whether you are a landlord preparing a claim or a tenant facing one, an experienced surveyor can help you understand where the cost of works and the diminution in value are likely to sit. Get your free commercial surveying quote in under 60 seconds and we will match you with the right specialist.

